Pinnacle Design/Build Installs Pre-Fabricated Bridge Over Stream Crossing for LNG Gate Station

A major energy infrastructures company needed a permanent bridge constructed over an existing stream crossing to gain access to an existing LNG Gate Station. Pinnacle Design/Build was chosen to install the heavy duty Big R Modular Bridge from AIL Mining, and completed the installation in just one day. Read more about the project by going to

http://www.ailmining.com/en/home/projects/prefabricated-bridge-provides-heavy-duty-access-to.aspx