The
key advantage to
Pinnacle Design/Build Group's
single source solution is the ability to continually provide our
customers with high performance, proven components for their retaining
wall systems.
Pinnacle Design/Build's total package provides our clients a complete
system, not just stand alone products. Pinnacle Design/Build's
engineers will only specify the highest quality components in our
solutions.
Pinnacle Design/Build Retaining Wall
Repair Project Profiles
|
 |
|
Killearn Lake Plaza - Retaining Wall Repair,
Tallahassee, FL
PROJECT
FACTS:
Wall Repair Area
= 14,600 SF;
Max Ht
= 29 FT
CHALLENGE: A
segmental retaining wall experienced sliding and
foundation failure shortly after construction. The wall
had to be repaired quickly and correctly to avoid
delaying the project.
SOLUTION: Pinnacle Design/Build visited the site and assessed the
geotechnical and construction quality control
information available, designed and constructed a
foundation improvement / drainage / wall system to get
the project back on track.
VALUE:
Pinnacle Design/Build provided the engineering and
construction expertise to quickly and cost-effectively
determine what caused the failure and rebuild the
structure to meet the client’s time and performance
needs.
|
|
 |
|
Dick Lane Velodrome - Retaining Wall Repair,
Atlanta, GA
PROJECT
FACTS:
Wall Repair Area
= 2,800 SF;
Max Ht
= 20 FT
CHALLENGE:
A large diameter headwall supporting the velodrome bicycle track
failed from foundation scour.
SOLUTION:
Pinnacle Design/Build designed an MSE retaining wall with a
welded wire form (WWF) stone facing to replace the failed
headwall. Our crews carefully demolished and removed the
failed structure and replaced it without incident.
VALUE:
The Pinnacle Design/Build solution saved the owner $100,000
when compared to other potential solutions.
|
|
 |
|
Sonic Drive-In - Retaining Wall Repair,
Ringgold, GA
PROJECT
FACTS:
Wall Area
= 2,300 SF;
Max Ht
= 17 FT
CHALLENGE:
The retaining wall supporting the parking lot and drive thru
lane of this restaurant failed due to scour at the toe.
SOLUTION:
Pinnacle Design/Build designed a scour mattress and an MSE
buttress wall with a welded wire form (WWF) stone facing to
shore the failed block wall. Our crews constructed
this mattress and wall system in front of the failed
structure and without incident.
VALUE:
The
Pinnacle Design/Build solution was quickly constructed
providing the required structural support with minimal
disturbance to the restaurant operations. Compared to
other options considered, this approach saved substantial
time and money.
|
|
 |
|
Walgreens Pharmacy - Retaining Wall Repair,
Germantown, TN
PROJECT
FACTS:
Wall Repair Area
= 2,900 SF;
Max Ht
= 18 FT
CHALLENGE:
The segmental retaining wall supporting the parking lot and
drive thru lane of this pharmacy was settling and unstable.
The pavement and fencing above the wall was damaged and
could not be repaired until the wall was stabilized.
SOLUTION:
Pinnacle Design/Build designed
an MSE buttress wall with a welded wire form (WWF) vegetated
facing to shore the failed block wall. Our crews
constructed this wall system in front of the failed
structure and without disrupting store operations or
disturbing the surrounding properties.
VALUE:
The
Pinnacle Design/Build solution effectively stabilized the
wall at less than half the cost of other options considered.
|
|
 |
|
American Self Storage Facility - Retaining Wall Repair,
Austin, TX
PROJECT
FACTS:
Wall Repair Area
= 5,300 SF;
Max Ht
= 17 FT
CHALLENGE:
A poorly constructed cast-in-place concrete retaining wall
supporting the slope next to this self storage facility
failed catastrophically. The failure also put an
adjacent high pressure gas line at risk.
SOLUTION:
Pinnacle Design/Build designed
a gravity retaining wall using Redi-Rock TM large
block units to replace the failed wall. Our crews
carefully demolished and removed the failed structure and
replaced it without incident.
VALUE:
The
Pinnacle Design/Build solution saved the developer over
$500,000 when compared to other potential solutions. In
addition, the entire project (design to closeout) was
completed in 28 days without damaging ore even taken the gas
line of of service. |
|
 |
|
Palisades Drive,
Signal Mountain, TN
PROJECT
FACTS:
Wall
Area
= 1,000 SF;
Max Ht
= 15 FT
CHALLENGE:
A century old, stacked stone retaining wall supporting
Palisades Drive where it passes over a protected,
environmentally sensitive creek was progressively failing.
The failing wall put the busy roadway above and its
passengers at risk. The wall had to be repaired without
compromising the creek and with minimum impact to traffic.
SOLUTION:
Pinnacle Design/Build designed a gravity buttress wall using
Redi-Rock™ large block units to stabilize the failing wall.
Our crews carefully constructed the challenging repair
without incident.
VALUE:
The Pinnacle Design/Build solution saved the town over
$300,000 when compared to other solutions considered. In
addition, the entire project (design to closeout) was
completed in less than one month while keeping the Palisades
Drive open to traffic.
|
|
 |
|
K-mart Store - Retaining Wall Repair,
Bluefield, WV
PROJECT
FACTS:
Wall Repair Area
= 1,280 SF;
Max Ht
= 8 FT
CHALLENGE:
A segmental retaining wall supporting the parking lot of a
K-mart store had experienced failure. The owner wanted
the wall repaired without impacting store operations.
SOLUTION:
Pinnacle Design/Build designed
a gravity retaining wall using Redi-Rock TM large
block units to replace a portion of the failed retaining
wall. Our crews carefully demolished and removed the
failed structure, regraded the area and constructed the
gravity replacement wall.
VALUE:
The
Pinnacle Design/Build solution
was
implemented without complete demolition of the existing wall
which would have impacted store operations. The
partial reconstruction saved significant time and money when
compared to other options. |
|
 |
|
Verandas at Blairstone,
Tallahassee, FL
PROJECT
FACTS:
Wall
Area
= 4,000 SF;
Max Ht
= 22 FT
CHALLENGE:
An existing MSE segmental retaining wall (SRW) supporting
this multi-family housing development was bulging and in
danger of collapse.
SOLUTION:
An engineered system consisting of soil nails through the
existing wall (to stabilize the mass) and a matching SRW
facing was constructed.
VALUE:
This composite retaining wall solution of provided a quick
and visually pleasing repair that did not require total
demolition of the failing wall or major disruption to the
residence of the community.
|
|
| |
|
|
|
You must have the Adobe
Acrobat Reader to view our brochures, newsletters, etc. You can get the
Adobe Acrobat Reader
for Free! |
|
|