Pinnacle
Design/Build has successfully designed and constructed hundreds of
thousands of square feet of retaining walls on transportation projects
throughout the United States. Our commitment to safety, quality and
schedule makes us one of the leading specialty geo-structural
contractors to the transportation sector. We have completed projects in
major airports, along interstate highways, on busy city streets and on
remote US and state highways. No environment is too challenging.
Pinnacle Design/Build
Transportation Project Profiles
|
 |
|
I-24 at Manson Pike,
Murfreesboro, TN
PROJECT
FACTS:
Wall Area
= 57,000 SF;
Max Ht
= 28 FT
CHALLENGE:
The Tennessee Department of Transportation’s new interchange
along Interstate 24 required retaining walls to support the
ramps and bridge abutments.
SOLUTION:
Pinnacle Design/Build constructed segmental retaining walls
to support the ramps and bridge abutments.
VALUE:
Pinnacle Design/Build constructed the completion of the
retaining walls to allow the prime contractor to complete
the overall project on time. |
|
 |
|
I-10 at Picardy Lane,
Baton Rouge, LA
PROJECT
FACTS:
Wall Area
= 230,000 SF;
Max Ht
= 33 FT
CHALLENGE:
The Louisiana Department of Transportation’s new interchange
along Interstate 10 required retaining walls to support the
ramps and bridge abutments.
SOLUTION:
Pinnacle Design/Build constructed segmental retaining walls
to support the ramps and bridge abutments.
VALUE:
Pinnacle Design/Build constructed the completion of the
retaining walls to allow the prime contractor to complete
the overall project on time.
|
|
 |
|
Palisades Drive,
Signal Mountain, TN
PROJECT
FACTS:
Wall
Area
= 1,000 SF;
Max Ht
= 15 FT
CHALLENGE:
A century old, stacked stone retaining wall supporting
Palisades Drive where it passes over a protected,
environmentally sensitive creek was progressively failing.
The failing wall put the busy roadway above and its
passengers at risk. The wall had to be repaired without
compromising the creek and with minimum impact to traffic.
SOLUTION:
Pinnacle Design/Build designed a gravity buttress wall using
Redi-Rock™ large block units to stabilize the failing wall.
Our crews carefully constructed the challenging repair
without incident.
VALUE:
The Pinnacle Design/Build solution saved the town over
$300,000 when compared to other solutions considered. In
addition, the entire project (design to closeout) was
completed in less than one month while keeping the Palisades
Drive open to traffic.
|
|
-2.jpg) |
|
University of Virginia - North Grounds Connector,
Charlottesville, VA
PROJECT
FACTS:
Wall Area
= 24,200 SF;
Max Ht
= 42 FT
CHALLENGE: The
University of Virginia needed a new roadway over a
stream valley.
SOLUTION: Pinnacle Design/Build constructed two back to back 42 ft
tall MSE- panel retaining walls to support the
elevated roadway.
VALUE:
The MSE retaining walls were constructed quickly and at a
lower cost than conventional retaining wall options.
The vertical
retaining walls minimized the roadway’s footprint
onto the stream valley.
|
|
 |
|
Consolidated Rental Car Facility (CONRAC),
Hartsfield-Jackson Int. Airport,
Atlanta, GA
PROJECT
FACTS:
Wall Area
= 2,200 SF;
Max Ht
= 29 FT
CHALLENGE:
The City of Atlanta required a new bridge and embankment
at a key intersection inside the new CONRAC facility
under construction at the Hartsfield-Jackson
International Airport.
SOLUTION: Pinnacle
Design/Build constructed an MSE Panel retaining walls to
form the abutments on both sides of the bridge. We also
constructed precast and cast-in-place concrete coping to
finish the top of the walls.
VALUE:
The MSE-Panel Retaining Wall supplied the structural
support required while its architectural finish provided
an aesthetically pleasing touch.
|
|
 |
|
Blue Ridge Parkway Landslide Repair,
Spruce Pine, NC
PROJECT
FACTS:
Wall Area
= 5,000 SF;
Max Ht
= 22.5 FT
CHALLENGE:
Repair to the parkway at the several landslide locations.
SOLUTION:
Pinnacle
Design/Build was part of a design team that utilized soil
nailing, tiebacks and MSE retaining walls to stabilize the
slide and support the reestablished roadway.
VALUE:
The solution of soil nailing and MSE retaining walls
provided a high performance and reliable support system.
|
|
 |
|
UT DOT US 491,
Monticello, UT
PROJECT
FACTS:
Wall Area
= 6,000 SF;
Max Ht
= 14 FT
CHALLENGE:
Utah DOT required a cost effective wall system to support
widening of US Route 491 over a small ravine. Specifications
called for a system that blended will with the natural
environment of southeastern Utah.
SOLUTION:
Pinnacle Design/Build constructed a desert brown, split
faced Segmental Retaining Wall (SRW) and heavy-duty
cast-in-place concrete coping system.
VALUE:
The Pinnacle Design/Build solution was constructed quickly
and cost effectively with minimum disruption to traffic and
the surrounding desert.
|
|
 |
|
TN DOT SR 386,
Hendersonville, TN
PROJECT
FACTS:
Wall Area
= 17,000 SF;
Max Ht
= 26 FT
CHALLENGE:
The Tennessee Department of Transportation's new interchange
along State Route 386 required gracefully curving retaining
walls to support the ramps and abutments on both ends of a
new bridge.
SOLUTION:
Pinnacle Design/Build designed and constructed two smoothly
curved segmental retaining walls (SRWs) to meet the DOT's
requirements.
VALUE:
Pinnacle Design/Build rapidly completed the complex
construction to meet the General Contractors accelerated
schedule for bridge beam installation.
|
|
|
|
|
|
|
|