Expansion of this coal burning power plant required increased area for storage/decanting of ash by-products. The adjacent wetlands along the Ohio River had to be protected and limited the space available for expansion.

SOLUTION
The project’s engineer decided to increase the capacity of the facility’s existing wet ash storage pond by raising the height of the surrounding dike. Stone faced, mechanically stabilized earth walls were designed to safely accomplish the vertical expansion and provide the required storage volume.

VALUE
Pinnacle Design/Build’s experienced construction crews and design professionals delivered the solution to the owner on time and on budget.

PROJECT FACTS

Wall Area: 188,000 SF
Max Height: 52.5 FT
Completed 2009

Engineered stone-faced MSE retaining wall system by Pinnacle Design/Build, providing a cost-effective vertical pond expansion solution to increase by-product storage at a Kentucky generating station.